magnify

Running a Schedule

To run a schedule,

  1. click Schedules.
  2. Click Add Schedule.
  3. Set the weeks in which the schedule will run.
  4. Click Next.
  5. Confirm the schedule range. If desired, check Automatic Schedule of selected weeks.
  6. Click Next.
  7. Review the results.
  8. Click Save Schedule to save the official schedule.

Print this entry